Applicability of Pressure Retarded Osmosis Power Generation Technology in Istanbul
DOI:
https://doi.org/10.21533/pen.v6.i2.1730Abstract
In this study, the applicability of pressure retarded osmosis power generation was investigated in order to meet the electricity demand in Turkey. Pressure retarded osmosis (PRO) is a method that converting salinity gradients to power using a semi-permeable membrane against an applied pressure and PRO is one of the promising candidates to reduce fossil fuel dependency. In PRO, water is transported from a low concentrated feed solution to a high-concentrated draw solution. According to the literature findings, in order to produce 1MW of electricity 1m3/s fresh water flow is needed. Turkey is surrounded on three sides by water and has a big potential to develop this technology. Riva River is investigated in the scope this study. Currently Turkey’s total installed power capacity reached 85.200 MW at the end of 2017.Calculations of PRO power generation reveals that it is possible to generate 25,45 MW, If using 5% of total river flow.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.