Contribution of AHP method in prioritizing risk factors regarding tunnel project phases
DOI:
https://doi.org/10.21533/pen.v8.i4.1419Abstract
Tunnel projects are consistently regarded to be mostly a complex and risky engineering projects, owing to the features of the projects, since they increasingly achieve high risk and complexity during the execution of the project. this led to the fact that the necessity of risk management understanding and implementing is a crucial quest with the intention to obtain tunnel project objectives considering (time, cost, quality & safety) to avoid time and cost overruns and any other obstacles. it was observed the most affecting objective was Safety (47.3%) by AHP method in which it is actually reasonable as such project of tunnel need a great concern regarding that matter for many reasons for instance the closed construction area, ventilation considerations, blasting, and so on. the second major objective is quality (31.1%) in which as experts always say it has to be maintained as a high quality as possible.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.