Projects evaluation in construction industry
DOI:
https://doi.org/10.21533/pen.v8.i3.1214Abstract
The economic activity support in the construction industry in numerous developed countries is a percentage of about 5-11 of their GDP consumed yearly on different kinds of construction projects and associated activities. This paper attempts to evaluate the construction project under different circumstances and different periods. This paper was divided into several stages to accomplish its aim, the first stage, the researchers have gathered information about 30 projects in a different period starting from 2001 to 2017. The second stage included a questionnaire survey to get an indication of the importance of these factors. The third stage comprised analyzing the project's evolution using an artificial intelligence technique, which is a K-nearest neighbor classifier. The fourth stage included using the run chart technique to show the change in the evaluation of the project.
It can conclude that the project's evaluation is continuously fluctuated in different periods, the risks that occur have a direct relationship with cost and time overruns and indirect connection with project evaluation.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.