Projects evaluation in construction Industry
Abstract
It can conclude that the project's evaluation is continuously fluctuated in different periods, the risks that occur have a direct relationship with cost and time overruns and indirect connection with project evaluation.
Full Text:
PDFReferences
J. Bennett and E. J. J. o. p. e. Iossa, "Building and managing facilities for public services," vol. 90, no. 10-11, pp. 2143-2160, 2006.
J.-L. Gálvez-Martos, D. Styles, H. Schoenberger, B. J. R. Zeschmar-Lahl, Conservation, and Recycling, "Construction and demolition waste best management practice in Europe," vol. 136, pp. 166-178, 2018.
D. W. Halpin, G. Lucko, and B. A. Senior, Construction management. John Wiley & Sons, 2017.
A. Lee, R. Cooper, and G. Aouad, "A methodology for designing performance measures for the UK construction industry," in Bizarre Fruit Postgraduate Research Conference on the Built and Human Environment, 2000.
M. Samson and N. Lema, "Development of construction contractors performance measurement framework," in 1st International Conference of Creating a Sustainable, 2002.
A. S. Faridi, S. M. J. C. M. El‐Sayegh, and Economics, "Significant factors causing delay in the UAE construction industry," vol. 24, no. 11, pp. 1167-1176, 2006.
D. N. J. P. M. s. D. U. o. t. W. Hanson, "CAUSES OF CLIENT DISSATISFACTION IN THE SOUTH AFRICAN BUILDING INDUSTRY AND WAYS OF IMPROVEMENT: THE CONTRACTORS’PERSPECTIVES," 2006.
J. Mbachu, R. J. C. M. Nkado, and Economics, "Factors constraining successful building project implementation in South Africa," vol. 25, no. 1, pp. 39-54, 2007.
T. Y. Lo, I. W. Fung, K. C. J. J. o. c. e. Tung, and management, "Construction delays in Hong Kong civil engineering projects," vol. 132, no. 6, pp. 636-649, 2006.
Y. Frimpong, J. Oluwoye, and L. J. I. J. o. p. m. Crawford, "Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study," vol. 21, no. 5, pp. 321-326, 2003.
A. R. J. S. S. Atkinson, "The role of human error in construction defects," 1999.
P. E. Love, Z. Irani, and D. J. J. S. c. m. a. i. j. Edwards, "A seamless supply chain management model for construction," 2004.
M. Latham, "Constructing the team: final report of the government/industry review of procurement and contractual arrangements in the UK construction industry," ed: Hmso, London, 1994.
J. J. T. Egan and t. Regions, "Rethinking Construction. Department of the Environment," 1998.
B. Flyvbjerg, M. K. Skamris Holm, and S. L. J. T. r. Buhl, "How common and how large are cost overruns in transport infrastructure projects?," vol. 23, no. 1, pp. 71-88, 2003.
A. Toakley, M. J. E. Marosszeky, Construction, and A. Management, "Towards total project quality–a review of research needs," 2003.
H. J. E. Lind, Finansdepartementet, Ds, "Bostadsbyggandets hinderbana: en analys av utvecklingen 1995-2001," 2003.
J. E. Diekmann, M. C. J. J. o. c. E. Nelson, and Management, "Construction claims: Frequency and severity," vol. 111, no. 1, pp. 74-81, 1985.
S. Senaratne and M. Sexton, "Managing construction project change in the knowledge age: a case study," in 20th Annual ARCOM Conference, 2004, pp. 1-3: Citeseer.
X. Xiao and H. Ding, "Enhancement of K-nearest neighbor algorithm based on weighted entropy of attribute value," in 2012 5th International Conference on BioMedical Engineering and Informatics, 2012, pp. 1261-1264: IEEE.
B. Sun, J. Du, and T. Gao, "Study on the improvement of K-nearest-neighbor algorithm," in 2009 International Conference on Artificial Intelligence and Computational Intelligence, 2009, vol. 4, pp. 390-393: IEEE.
J. Anhøj and A. V. J. P. O. Olesen, "Run charts revisited: a simulation study of run chart rules for detection of non-random variation in health care processes," vol. 9, no. 11, p. e113825, 2014.
S. K. J. Q. T. Gauri and Q. Management, "A quantitative approach for detection of unstable processes using a run chart," vol. 7, no. 3, pp. 231-247, 2010.
D. B. Septiawan, R. J. J. o. b. Bekti, and management, "Analysis of Project Construction Delay Using Fishbone Diagram at PT. Rekayasa Industri," vol. 5, no. 5, pp. 634-650, 2016.
DOI: http://dx.doi.org/10.21533/pen.v8i3.1593
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Authors
This work is licensed under a Creative Commons Attribution 4.0 International License.
ISSN: 2303-4521
Digital Object Identifier DOI: 10.21533/pen
This work is licensed under a Creative Commons Attribution 4.0 International License