Application of Monte Carlo simulation and PERT/CPM techniques in planning of construction projects: A Case study
Abstract
Full Text:
PDFReferences
Ramo Palalic, Benjamin Durakovic, Azra Brankovic and Ognjen Ridic, "Students’ entrepreneurial orientation intention, business environment and networking: insights from Bosnia and Herzegovina," International Journal of Foresight and Innovation Policy, vol. 11, no. 4, pp. 240-255, 2016.
Benjamin Durakovic and Muris Torlak, "Experimental and numerical study of a PCM window model as a thermal energy storage unit," International Journal of Low-Carbon Technologies , vol. 12, pp. 272-280, 2016.
M. Torlak, B. Durakovic, H. Gabranovic and N. Delalic, "CFD-Based Assessment of Thermal Energy Storage in Phase-Change Materials (PCM)," ENTECH_2014, no. 1, pp. 263-275, 2014.
Benjamin Durakovic and Muris Torlak, "Simulation and experimental validation of phase change material and water used as heat storage medium in window applications," Journal of Materials and Environmental Sciences ISSN : 2028-2508 , vol. 8, no. 5, pp. 1837-1846, 2017.
B. Durakovic, H. Basic and A. Softic, "Six Sigma Model Testing in Optimizing Medium-Sized Company Production Process," Journal of Trends in the Development of Machinery and Associated Technology, vol. 16, no. 1, pp. 103-106, 2012.
W. Agyei, "Project Planning And Scheduling Using PERT and CPM Techniques With Lineer Programming," vol. 4, pp. 222-223, 2015.
B. Durakovic, H. Basic and H. Muhic, "The Interrelationships Between Quality Management Practices and Their Effects on Innovation Performance," Trends in the Development of Machinery and Associated Technology TMT 2014, pp. 181-184, 2014.
B. Durakovic and H. Basic, "Continuous Quality Improvement in Textile Processing by Statistical Process Control Tools: A Case Study of Medium-Sized Company," Perıodıcals of Engıneerıng and Natural Scıences, vol. 1, no. 1, pp. 39-46, 2013.
B. Durakovic and H. Basic, "Textile Cutting Process Optimization Model Based on Six Sigma Methodology in A Medium-Sized Company," Journal of Trends in the Development of Machinery and Associated Technology, vol. 16, no. 1, pp. 107-110, 2012.
Duncan Haughey, Project Management Tools, 2015.
G. Hagan, Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS), vol. 13, Fort Belvoir, Virginia: Defense Acquisition University Press", 2017.
M. W.NEWELL and M. N. Grashina, "The project Management Question and Answer," p. 68.
S. J. Mantel and J. R.Meredith, "Network Techniques: PERT (ADM) and CPM (PDM)," in Project Management, A Managerial Approach Seventh Edition, United States of America, John Wiley & Sons, 2009, pp. 343-344.
"www.investopedia.com/terms/s/swot.asp," [Online].
K. Zhaoni , Z. Jianping , L. Chao , Z. Xiaoying and Q. , "Risk Assessment of Plan Schedule by Monte Carlo Simulation," pp. 509-510, 2015.
DOI: http://dx.doi.org/10.21533/pen.v5i3.152
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Mertcan Karabulut
This work is licensed under a Creative Commons Attribution 4.0 International License.
ISSN: 2303-4521
Digital Object Identifier DOI: 10.21533/pen
This work is licensed under a Creative Commons Attribution 4.0 International License